Overview
This ground-up project included the construction of both superstructure and site improvements which required extensive blasting and rock removal. Included in the scope of work was a monumental steel spiral stair leading from the ground to a mezzanine level in the Library. A four pipe hydronic heating and cooling system was installed throughout the facility.
Project Details
| Size | 65,000 sf |
| Client | Washington Co. Public Schools |
| Scope | New 65,000 SF Elementary School |
| Architect | BFM Architects, Inc. |